KPI Green Energy to Develop 100 MW Solar Power Project

KPI Green Energy has secured a contract to develop a 100 MW solar power project within its captive power producer segment. The subsidiary, Sun Drops Energia, will execute the project under the Distributed Renewable Energy Bilateral Purchase (DREBP) Policy, slated for completion by 2026-27 in multiple stages.


Devdiscourse News Desk | New Delhi | Updated: 09-10-2025 16:56 IST | Created: 09-10-2025 16:56 IST
KPI Green Energy to Develop 100 MW Solar Power Project
This image is AI-generated and does not depict any real-life event or location. It is a fictional representation created for illustrative purposes only.
  • Country:
  • India

KPI Green Energy announced on Thursday that it has received a contract to develop a 100 MW solar power project in its captive power segment.

According to a regulatory filing, the order comes through multiple industrial investors under the Distributed Renewable Energy Bilateral Purchase (DREBP) Policy and is set for development by KPI's subsidiary, Sun Drops Energia.

The timeline for the project's completion extends across several tranches, expected to finalize in the 2026-27 period.

(With inputs from agencies.)

Give Feedback