Entire Mumbai-Ahmedabad section of bullet train project will open by 2029: Railway Minister Ashwini Vaishnaw in Surat.


PTI | Surat | Updated: 27-09-2025 12:18 IST | Created: 27-09-2025 12:18 IST
Entire Mumbai-Ahmedabad section of bullet train project will open by 2029: Railway Minister Ashwini Vaishnaw in Surat.
  • Country:
  • India

Entire Mumbai-Ahmedabad section of bullet train project will open by 2029: Railway Minister Ashwini Vaishnaw in Surat.

(This story has not been edited by Devdiscourse staff and is auto-generated from a syndicated feed.)

Give Feedback