Revamping Power: Arunachal's Energy Transformation
Arunachal Pradesh Deputy CM Chowna Mein announces a major overhaul of the state's power sector, focusing on urban system strength, grid integration, and extending electricity to rural areas. A Rs 2,000 crore, four-year plan under the Chief Minister’s Programme aims to modernize infrastructure and minimize technical losses.

- Country:
- India
The Deputy Chief Minister of Arunachal Pradesh, Chowna Mein, has revealed plans for a significant overhaul of the state's power department, a change that has been long anticipated.
In a recent review meeting, Mein outlined the Chief Minister's Comprehensive State Power Development Programme, with a budget of Rs 2,000 crore over the next four years. This initiative aims to enhance sub-transmission and distribution in urban and densely populated regions.
In efforts to extend electricity to newly formed districts and unelectrified rural areas, the programme focuses on integrating local generation into the grid. Instructions have been given to reduce AT&C losses to below 15%, and modernize infrastructure. Further, safety guidelines for linemen and electrical workers are to be established, with a restructured proposal slated for cabinet review.
(With inputs from agencies.)
- READ MORE ON:
- Arunachal
- Power
- Development
- Electricity
- Hydropower
- Infrastructure
- Renewable
- AT&C Losses
- Grid
- Urban
ALSO READ
Leading the Wind: Girish Tanti's Vision for India's Renewable Energy Future
AVP Infracon Secures Key Infrastructure Contract in Tamil Nadu
CIL Ventures Into Renewables with New Rajasthan Subsidiary
Sembcorp Secures Major Renewable Energy Contract in India
Himachal's Apple Season Strategy: Fairness, Infrastructure, and Market Reforms