Electric Bus Incident Near Mumbai Metro Site Reveals Infrastructure Challenges

An electric bus belonging to the Brihanmumbai Electric Supply and Transport (BEST) got stuck in a pit caused by Metro construction in south Mumbai. No passengers were harmed. The incident highlights infrastructure issues, with authorities investigating the five-foot-deep pit's creation by ongoing Metro work.


Devdiscourse News Desk | Mumbai | Updated: 16-06-2025 11:29 IST | Created: 16-06-2025 11:29 IST
Electric Bus Incident Near Mumbai Metro Site Reveals Infrastructure Challenges
This image is AI-generated and does not depict any real-life event or location. It is a fictional representation created for illustrative purposes only.
  • Country:
  • India

An electric midi bus operated by the Brihanmumbai Electric Supply and Transport (BEST) found itself ensnared in a pit this Monday morning. The incident unfolded near a Metro construction site at Girgaon in Mumbai, officials disclosed.

Fortunately, no casualties were recorded as all passengers were evacuated safely. The rear of the vehicle sank into the pit, which resulted from partial road collapse near Dr Babasaheb Jaykar Marg at the Thakurdwar Metro Line 3 site. Construction work remains ongoing in the area.

Local residents suggested the pit, nearly five-foot deep, appeared due to ongoing Metro construction work. Both BEST and the Mumbai Metro Rail Corporation (MMRC) have initiated enquiries to explore concern over infrastructure stability.

(With inputs from agencies.)

Give Feedback